Australian modular homes
Homes for
everyone,
everywhere
Built in a factory to the millimetre, delivered finished, and installed in days. Not a kit and not a caravan — a permanent home that simply was not assembled in the weather.

- Designs in the range
- 10
- Internal area
- 20–120 m²
- Design approval to delivery
- ~4 months
- Permits through handover
- Turnkey
The range
10 homes, one bedroom to four



How a build runs
Six steps, in this order
- 01
Showroom Visit
Visit our Melbourne showroom to explore finishes, layouts, and what is possible with 6Homes.
- 02
Determine Site Specifics
We assess your land, zoning and access to make sure your design fits the block properly.
- 03
Design
Work with our team to customise the look, layout and inclusions of your new home.
- 04
Order / Purchase
Once your plans are finalised we lock in pricing and move forward with approvals.
- 05
Manufacture
Your home is built in our off-site facility with precision, care and quality control.
- 06
Shipping & Installation
We deliver your home and complete onsite setup — ready for you to move in.
Standard, always
Premium is the
specification
There is no cheaper version of a 6Homes home with the budget tapware in it. This list is what arrives, every time, on every design.
- 01Double-glazed windows and doors
- 02Designer kitchens and bathrooms
- 03Your choice of tapware finishes
- 04Energy-efficient insulation
- 05Turnkey service from permits to handover
Delivered
Homes already standing
Before you ask
The four we hear most
How long does it take to receive my modular home?
Subject to design and site constraints, a modular home can be delivered approximately four months from the moment layouts, finishes and fixtures have been selected, signed off and deposits paid.
How do I finance it?
Modular construction often requires the majority or entirety of payment upfront. We have partnered with finance teams so more flexible payment terms can be made available. A consultation can be arranged to explore your finance options.
What permits do I need?
If a planning permit application is required for your property, our team of planners can assist you throughout the process. In some cases all you will need is a building permit — our team can advise on this too.
Can I make changes to the floorplan?
Yes. We know our standard layouts will not suit every site or every household, so we work through what can be changed within the module structure and show you what is possible.


